PAST PROJECTS

COMMERCIAL

Monterey Shore 300_MonumentSignP1090518Monterey Shore Business Park, Palm Desert CA . Project and construction manager and construction manager for a for-sale condominium park. 68,000 sf

North Cook Business Park, Cook Street, Palm Desert CA.  Project manager and construction manager for an industrial park in the Coachella Valley area of Riverside County. 88,000 sf

Dinah Shore Flex Industrial Buildings , Palm Desert CA.  Handled negotiation with neighboring properties and provided the construction management on 16 tilt up industrial buildings.   225,000 sf

Corona Flex Industrial Buildings, Temescal Canyon, CA.  Provided the construction management for 3 Industrial flex buildings in Corona along the 15 freeway.

University Research Park, Twin Office Towers, Irvine CA. Served as project and construction manager for 3,500-car parking structure for the University Research Park Phase IX, a 2, 12-story Class “A” office complex.   459,000 sf

Paragon Biomedical, Irvine CA  Overall program/project manager for this biomedical, corporate headquarters/R&D facility in the Irvine Spectrum.  29,800 sf

Layne Christensen Regional Office Relocation, Ontario CA.  Managed Pre-development and Programming for the relocation of offices and yard.

Redlands Police Station Relocation, Redlands CA.  Worked with a team to provide Pre-development, Site selection and Programming of the future relocation of the Redlands Police Station.

RETAIL

42nd and Jackson, Indio CA   Assisted in the Preconstruction and managed the site and public work improvements on this 9.7 acre Retail site in Indio.  Handled negotiations with IID electrical utility for major infrastructure installation and pole removals.

Retail Building, Washington at the 10 Freeway, Palm Desert CA.  Provided Construction Management Services for a multi-tenant retail building at in Palm Desert.  12,700 sf

Catalina Building, Catalina and Elena, Redondo Beach CA.  Managed Design Development and the shell construction of a high end retail building.  5500 sf.

Yogurtland Franchises, South Bay and San Francisco Bay Area CA  Handled the Design Management, Permit Processing, and Construction Management of Yogurtland stores in Redondo Beach, Manhattan Beach, Two stores in Torrance, San Pedro, Burlingame, and San Francisco.

Chase Bank RPVChase Bank Shell Construction, Rancho Palos Verdes CA  Processed Permits and provided the Construction Management for a shell building.  Construction included drilling more than 50 caissons into the cliff 65′ deep to stabilize the podium style construction with subterranean parking.

Wahoos Redondo

 

Wahoo’s Fish Tacos, Redondo Beach CA. Handled the Design Management, Donut ModifiedPermit Processing, and Construction Management of an inline Wahoo’s Restaurant.

 

Dunkin’ Donuts Stores, Orange County, Long Beach, and Roseville, CA.  Handled all aspects of Project Pre-development, Entitlements, Design and Construction Management of four stores of the first stores in California.  Also worked Predevelopment and assisted with Site Selection on other future stores.

 Rite Aid Drugs Retail Center, Anaheim, CA.  Handled all aspects of Project Pre-development, Entitlements, Design and Construction Management of the demolition and reconstruction of a retail center anchored by a Rite Aid Drugs.  Also worked on Pre-development and assisted with site selection for other locations throughout Southern California.

Adaptive Reuse of the Bixby Knoll’s Ralph’s, Long Beach, CA.   Provided Construction Management Services 20160112_134110to Red Mountain Real Estate Group.  Handled the division of the grocery space into seven individual spaces for the major tenants of Trader Joe’s, Pet Food Express, and Crunch Fitness.  Working with P and R Architects, a 42′ facade was built to give a unique feel to each of the major tenant entrances.   Project completed on time and within budget.

 

Ross Store Landlord Work, Stockton CA.   Provided Project Management services to help design and upgrade the existing storefront and building with additional improvements to the signage, lighting, and truck dock/receiving area.

Fountain Valley Shoppes, Fountain Valley , CA.   Provided Project Management services to help design and construct a ground up 9,600 sf retail building for multiple food use tenants.  This infill project was challenged by existing parcel constraints and a unique City vision for the building.  Coordinated with the future tenants of Chipotle, Habit Burger, Wingstop, and Blaze Pizza.

Asset Management Construction Build Outs throughout Western US.   Managed the buildouts of multiple tenant spaces from Cold shell to turn key per tenant work letter specifications.  Projects spread throughout Utah, Nevada, Arizona, Texas and Northern California.

HARTIGAN Project Management, 405 Bay Hill Drive, Newport Beach, CA 92660 949.842.6129 [email protected]